Conservation Plan vs Conservation Contract: What Is the Difference

Think of the plan as the blueprint and the contract as the building permit with a payment schedule attached. You can have a blueprint without ever pouring a foundation. You cannot get paid for a foundation you did not build to spec.

That is the whole distinction in a sentence, but it trips up plenty of first-time applicants who think signing up for help means signing something binding on day one. It does not. The planning step is free, voluntary and comes first. The contract comes later, only if your application is selected, and only if you decide to sign.

What a conservation plan is

NRCS describes a conservation plan as something that identifies the customer's conservation objectives and assesses the natural resource concerns on your land: soil, water, animals, plants, air, energy and the human side of the operation. In practice, a planner meets you, looks at your maps and soils, walks the ground and writes down what is going on and what could be done about it.

A typical plan includes:

  • Your goals for the land, in your words.
  • Maps of soils, fields, water and problem areas.
  • An inventory of resource concerns such as erosion, nutrient runoff, poor forage or livestock access to streams.
  • A list of recommended practices and where they would go.
  • A rough order of work, so you are not asked to fence, seed and tile in one week.

NRCS says technical assistance is free, and the plan is yours. You can take it, use parts of it, wait a year or put it in a folder. Many operations use a plan to improve things with their own money and never apply for a dime. Some plans are specialized, such as a grazing plan or a nutrient management plan, but they all start with the same basic conversation.

What a conservation contract is

A contract is a legal agreement between you and USDA for a program such as EQIP. It lists the specific practices you agree to install, the amount of each, the fields or locations, the schedule and the payment attached to each practice. It also references the standards and specifications for each practice, which are the technical rules the work has to meet.

NRCS says on its EQIP page that if you are selected, you can choose whether to sign, and that after you sign you receive the standards and specifications and have a set period to finish the work. Payment comes after the work is implemented and inspected, if it meets NRCS standards. Those timing details are the reason starting a practice before the contract is a bad idea.

Side by side

Conservation planConservation contract
CostFree technical help from NRCSYou pay for the work; the program reimburses part according to its rules
Binding?Voluntary, a roadmapLegal agreement once signed
ScopeWhole operation or selected fieldsSpecific practices, amounts and dates
WhenBefore you applyAfter selection, if you accept
ChangesUpdate any timeModifications need NRCS approval
PaymentNoneAfter certified completion, per program rules

One caution: the plan is not always purely optional. If you farm highly erodible land, your conservation system, which is a form of plan, is part of what keeps you in compliance. See highly erodible land and wetland compliance. So a plan can be a voluntary roadmap and a compliance document at the same time.

How the two connect

  1. You meet with NRCS and the planner develops the plan. If you are new to this, see how to visit your local NRCS field office.
  2. You choose which parts of the plan you want help paying for and submit an application.
  3. NRCS ranks applications. Rankings consider local resource concerns, the conservation benefit and applicant needs, according to the agency.
  4. If funded, practices from your plan are written into the contract with dollar figures set by the program in your state.
  5. You complete the work to standard, NRCS verifies it and payment follows.

The tie between plan and contract is why a sloppy plan creates problems later. If the plan says a waterway belongs in the low spot but you have always driven the planter through there, better to say so before the contract than after the first rain. You want your plan to match what you will actually do, not what looks tidiest on a map.

Why the difference matters to you

You can plan without committing

There is no penalty for getting a plan and walking away. If funding is tight in your state, a plan also lets you stage the work yourself over several seasons.

A contract has fine print

Read the practice lifespan, which is how long you must keep the practice in place after it is installed. Read the schedule and what happens if weather ruins your timeline. Ask what NRCS expects if you sell or lose control of the land. If you walk away from a contract you may owe money back, so do not sign a thing you cannot see yourself finishing. A neighbor who signed up for every practice on the list and then ran out of summer has a story that ends with a letter.

Records follow you

Both documents generate paperwork. Keep your copies, photos and receipts in one place. A contract log makes the final certification and any later review much easier, and so does knowing what happens after your application is funded.

Quick answers

Do I need a conservation plan before I apply?

NRCS planning is generally the first step, and the agency's how-to-apply page says a planner will help you decide whether financial assistance is right for you. Ask your local office how it handles applications in your state. Some programs require specific plan elements.

Can I change my contract after I sign?

Sometimes. Changes to practices, amounts or schedules generally need NRCS approval, and the program has rules about what is allowed. Call before you deviate, not after.

Is the plan the same as the contract?

No. The plan identifies what could be done. The contract commits you and USDA to specific practices and payments. You can have the first without the second.